SOLAR ENERGY

Renewable Energy Our Future

Our solar power plants in Sivas and Konya are joined by a new rooftop solar installation at our Amasya factory.

3
Plants
%40
Renewable Energy Share
3.200 t
Annual CO₂ Saved
OUR PLANTS

Solar Power Plants

Amasya Factory Rooftop Solar Plant
PLANT #1

Amasya Factory Rooftop Solar Plant

📍 Amasya Marble Factory

The new solar power plant installed on the roof of our Amasya marble factory expands our renewable energy investments. Using the roofs of the factory buildings, this investment brings natural stone production and solar energy together at the same facility.

Sivas Solar Power Plant
PLANT #2
Since: 2018

Sivas Solar Power Plant

📍 Sivas

Our Sivas solar power plant supplies part of the electricity used by our factories and offices from a renewable source.

Konya Solar Power Plant
PLANT #3
Since: 2025

Konya Solar Power Plant

📍 Konya

Our solar power plant in Konya provides clean energy to our operations in the region with 1 MWp of installed capacity. This plant marks an important step in expanding Emmioğlu Group's renewable energy investments to Central Anatolia.

Capacity
1 MWp
WHY RENEWABLE ENERGY

For a Sustainable Future

♻️

Carbon Reduction

Annual CO₂ emissions are reduced by 3,200 tons through renewable energy use.

💰

Energy Cost Savings

Solar energy production reduces the total energy bill of group companies by 40% annually.

🌍

Sustainability Vision

The goal is to meet 70% of operations with renewable energy by 2030.

📊

Energy Independence

Generating our own electricity diversifies our energy supply and helps us manage costs.

🏭

Factory Integration

Using electricity generated at our facilities in production supports energy efficiency.

🔋

Storage Investments

Battery storage systems will be installed in the future to support night operations with renewable energy.

2030 VISION

Target: 70% of operations powered by renewable energy

We aim to double our renewable energy capacity by 2030 with new solar power plants, battery storage systems and wind energy investments.

2018 — First Plant Commissioned25%
2024 — 40% Share with Second Plant40%
2027 — Target: 55%55%
2030 — Target: 70%70%
Emmioğlu Grup

Leadership in natural stone and marble since 1986.

Contact

Organized Industrial Zone, 3rd St. No:1, Sivas / Türkiye
444 58 05
emmioglu@emmioglu.com
Emmioğlu Mermer Madencilik İnşaat Taahhüt İnşaat Malzemeleri Mühendislik Akaryakıt Petrol Ürünleri Turizm İmalat İthalat İhracat Ticaret ve Sanayi A.Ş.
MERSIS No: 0334015732100010 · Trade Registry No: 7286 (Sivas) · Tax Office: Sivas Site V.D. · Tax No: 3340157321
© 2026 Emmioğlu Group. All rights reserved.